Plant Wide Control - Standard Modules

Control across the plant / building is achieved by dual / triple redundant networked modules that can be prefabricated off site, tested prior to dispatch and shipped for quick connection into the target equipment using a plug and socket arrangement.

Modular construction techniques are used on each of the Control Modules with a preference for automatically assembled and pre-tested components. This approach achieves a 80% reduction in the manual aspect of individual termination of wiring which results in increased levels of reliability and a reduction of waste.